| Assessment Year | 1987 |
|---|---|
| Principal Product | GRINDING WHEELS |
| NAICS |
n/a
|
| SIC | 3291: Abrasive Products |
| Sales Range | $5 M to 10M |
| # of Employees | 50 |
| Plant Area |
n/a
|
| Annual Production | 667,000
lb
|
| Production Hrs. Annual | 2,250
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $59,002 | 710,141 |
kWh
|
$0.083 |
| Natural Gas | $22,750 | 3,147 |
MMBtu
|
$7.23 |
| Fuel Oil #2 | $16,929 | 3,058 |
MMBtu
|
$5.54 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $10,910 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $571 | $300 |
$571
7,034
kWh
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $236 | $58 |
$236
2,931
kWh
|
- | |
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $450 | - |
$450
5,569
kWh
|
- | |
| 04 | 2.6212: Turn off equipment during breaks, reduce operating time | $326 | - |
$326
3,810
kWh
|
- | |
| 05 | 2.2414: Use waste heat from hot flue gases to preheat | $9,327 | $9,700 | - |
$9,327
-
MMBtu
|
|
| TOTAL RECOMMENDED | $10,910 | $10,058 |
$1,583
19,344
kWh
|
$9,327
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs