ITAC Assessment: MA0088
ITAC logo
ITAC Assessment: MA0088
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product GRINDING WHEELS
NAICS
n/a
SIC 3291: Abrasive Products
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area
n/a
Annual Production 667,000
lb
Production Hrs. Annual 2,250
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $59,002 710,141
kWh
Natural Gas $22,750 3,147
MMBtu
Fuel Oil #2 $16,929 3,058
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,910 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $571 $300 $571
7,034
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $236 $58 $236
2,931
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $450 - $450
5,569
kWh
-
04 2.6212: Turn off equipment during breaks, reduce operating time $326 - $326
3,810
kWh
-
05 2.2414: Use waste heat from hot flue gases to preheat $9,327 $9,700 - $9,327
-
MMBtu
TOTAL RECOMMENDED $10,910 $10,058 $1,583
19,344
kWh
$9,327
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs