Assessment Year | 1986 |
---|---|
Principal Product | ELECTRICAL WIRE & CABLE |
NAICS |
n/a
|
SIC | 3357: Drawing and Insulating of Nonferrous Wire |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
n/a
|
Annual Production | 3,000,000
lb
|
Production Hrs. Annual | 6,144
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $289,084 | 3,138,042 |
kWh
|
$0.092 |
Natural Gas | $14,779 | 2,134 |
MMBtu
|
$6.93 |
Fuel Oil #2 | $25,700 | 4,606 |
MMBtu
|
$5.58 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $48,904 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $18,870 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|
01 | 2.1221: Replace obsolete burners with more efficient ones | $2,572 | $2,400 | - | - |
$2,572
-
MMBtu
|
|
02 | 2.6212: Turn off equipment during breaks, reduce operating time | $810 | $1,400 |
$810
8,792
kWh
|
- | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $6,831 | $800 |
$6,831
74,150
kWh
|
- | - | |
04 | 2.2437: Recover waste heat from equipment | $5,453 | $6,000 | - | - |
$5,453
-
MMBtu
|
|
05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $2,490 | $1,950 |
$3,564
38,687
kWh
|
$(-1,074.0)
-
MMBtu
|
- | |
06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $10,122 | $2,900 |
$14,904
161,782
kWh
|
$(-4,782.0)
-
MMBtu
|
- | |
07 | 2.7221: Lower temperature during the winter season and vice-versa | $4,050 | - |
$4,050
43,962
kWh
|
- | - | |
08 | 2.2514: Cover open tanks | $1,726 | $551 | - |
$1,726
-
MMBtu
|
- | |
09 | 2.4322: Use or replace with energy efficient substitutes | $14,850 | $20,000 |
$14,850
161,196
kWh
|
- | - | |
TOTAL RECOMMENDED | $48,904 | $36,001 |
$45,009
488,569
kWh
|
$(-4,130.0)
-
MMBtu
|
$8,025
-
MMBtu
|
||
TOTAL IMPLEMENTED | $18,870 | $8,751 |
$11,691
126,904
kWh
|
$1,726
-
MMBtu
|
$5,453
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs