ITAC Assessment: MA0061
ITAC logo
ITAC Assessment: MA0061
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product CUSTOM WELDED METAL PROD
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area
n/a
Annual Production 5,100,000
lb
Production Hrs. Annual 4,845
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $122,463 1,733,001
kWh
Natural Gas $74,067 10,892
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,339 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,339

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7231: Use radiant heater for spot heating $721 $800 - $721
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,705 $300 $6,705
94,959
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,390 $300 $7,390
104,631
kWh
-
04 2.7494: Install storm windows and doors $2,523 $6,945 - $2,523
-
MMBtu
TOTAL RECOMMENDED $17,339 $8,345 $14,095
199,590
kWh
$3,244
-
MMBtu
TOTAL IMPLEMENTED $17,339 $8,345 $14,095
199,590
kWh
$3,244
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs