ITAC Assessment: LT8403
ITAC logo
ITAC Assessment: LT8403
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Insurance services
NAICS 524114: Direct Health and Medical Insurance Carriers
SIC 6321: Accident and Health Insurance
Sales Range less than $500
k
# of Employees 200
Plant Area 69,544
ft2
Annual Production 1
units
Production Hrs. Annual 2,340
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $95,476 1,488,323
kWh
Electricity Demand $90,561 6,007
kW-mo/yr
Electricity Fees $22,671 -
TOTAL YEARLY COSTS $208,708
RECOMMENDED SAVINGS* $35,182 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $12,547 $16,884 $6,164
96,012
kWh
$6,383
-
kW-mo/yr
02 2.7232: Replace existing hvac unit with high efficiency model $21,654 $95,167 $10,643
166,296
kWh
$11,011
-
kW-mo/yr
03 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $981 - $981
15,285
kWh
-
TOTAL RECOMMENDED $35,182 $112,051 $17,787
277,593
kWh
$17,394
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs