ITAC Assessment: LT8366
ITAC logo
ITAC Assessment: LT8366
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Bromine Products
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 25
Plant Area 1,498,229
ft2
Annual Production 35,000
units
Production Hrs. Annual 8,736
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,186,875 19,582,158
kWh
Electricity Demand $204,417 12,754
kW-mo/yr
LPG $1,408 50
MMBtu
Waste Disposal Costs
Water Usage $53 10
Tgal
TOTAL YEARLY COSTS $1,392,753
RECOMMENDED SAVINGS* $22,638 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Ancillary Material Cost Savings
01 4.652: Replace existing equipment with more suitable substitutes $1,618 $11,719 $1,188
19,596
kWh
$430
-
kW-mo/yr
- -
02 4.652: Replace existing equipment with more suitable substitutes $2,157 $4,313 $1,583
26,126
kWh
$574
-
kW-mo/yr
- -
03 2.1321: Replace fossil fuel equipment with electrical equipment $18,863 $61,076 $(-227.5)
(-3,754)
kWh
- $1,408
-
MMBtu
$17,682
TOTAL RECOMMENDED $22,638 $77,109 $2,544
41,968
kWh
$1,004
-
kW-mo/yr
$1,408
-
MMBtu
$17,682
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs