| Assessment Year | 2023 |
|---|---|
| Principal Product | Bromine Products |
| NAICS | 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing |
| SIC | 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified |
| Sales Range | $100 M to 500M |
| # of Employees | 25 |
| Plant Area |
1,498,229
ft2
|
| Annual Production | 35,000
units
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Arkansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $1,186,875 | 19,582,158 |
kWh
|
$0.061 | |
| Electricity Demand | $204,417 | 12,754 |
kW-mo/yr
|
$16.03 | |
| LPG | $1,408 | 50 |
MMBtu
|
$28.25 | |
| Waste Disposal Costs | |||||
| Water Usage | $53 | 10 |
Tgal
|
$5.46 | |
| TOTAL YEARLY COSTS | $1,392,753 | ||||
| RECOMMENDED SAVINGS* | $22,638 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 4.652: Replace existing equipment with more suitable substitutes | $1,618 | $11,719 |
$1,188
19,596
kWh
|
$430
-
kW-mo/yr
|
- | - | |
| 02 | 4.652: Replace existing equipment with more suitable substitutes | $2,157 | $4,313 |
$1,583
26,126
kWh
|
$574
-
kW-mo/yr
|
- | - | |
| 03 | 2.1321: Replace fossil fuel equipment with electrical equipment | $18,863 | $61,076 |
$(-227.5)
(-3,754)
kWh
|
- |
$1,408
-
MMBtu
|
$17,682 | |
| TOTAL RECOMMENDED | $22,638 | $77,109 |
$2,544
41,968
kWh
|
$1,004
-
kW-mo/yr
|
$1,408
-
MMBtu
|
$17,682 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs