ITAC Assessment: LT0055
ITAC logo
ITAC Assessment: LT0055
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product MOLDED RUBBER PARTS
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area
n/a
Annual Production 13,500,000
pieces
Production Hrs. Annual 4,342
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $160,665 2,121,923
kWh
Natural Gas $8,027 1,923
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,117 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,264

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2511: Insulate bare equipment $287 $270 $287
6,448
kWh
- -
02 2.2511: Insulate bare equipment $219 $360 $219
4,689
kWh
- -
03 2.2515: Use optimum thickness insulation $4,130 $5,659 $4,130
90,563
kWh
- -
04 2.2437: Recover waste heat from equipment $1,226 $1,220 - $1,226
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $278 $129 $278
3,810
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $7,847 $16,480 $6,692
91,735
kWh
- $1,155
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $130 $71 $130
586
kWh
- -
TOTAL RECOMMENDED $14,117 $24,189 $11,736
197,831
kWh
$1,226
-
MMBtu
$1,155
TOTAL IMPLEMENTED $12,264 $22,409 $11,109
188,746
kWh
- $1,155
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs