Assessment Year | 1986 |
---|---|
Principal Product | MOLDED RUBBER PARTS |
NAICS |
n/a
|
SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 75 |
Plant Area |
n/a
|
Annual Production | 13,500,000
pieces
|
Production Hrs. Annual | 4,342
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $160,665 | 2,121,923 |
kWh
|
$0.076 |
Natural Gas | $8,027 | 1,923 |
MMBtu
|
$4.17 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $14,117 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,264 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $287 | $270 |
$287
6,448
kWh
|
- | - | |
02 | 2.2511: Insulate bare equipment | $219 | $360 |
$219
4,689
kWh
|
- | - | |
03 | 2.2515: Use optimum thickness insulation | $4,130 | $5,659 |
$4,130
90,563
kWh
|
- | - | |
04 | 2.2437: Recover waste heat from equipment | $1,226 | $1,220 | - |
$1,226
-
MMBtu
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $278 | $129 |
$278
3,810
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,847 | $16,480 |
$6,692
91,735
kWh
|
- | $1,155 | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $130 | $71 |
$130
586
kWh
|
- | - | |
TOTAL RECOMMENDED | $14,117 | $24,189 |
$11,736
197,831
kWh
|
$1,226
-
MMBtu
|
$1,155 | ||
TOTAL IMPLEMENTED | $12,264 | $22,409 |
$11,109
188,746
kWh
|
- | $1,155 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs