ITAC Assessment: LS2416
ITAC logo
ITAC Assessment: LS2416
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Water Treatment
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $50
M
to 100
M
# of Employees 20
Plant Area 403,738
ft2
Annual Production 5,110,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $364,571 4,504,900
kWh
Electricity Demand $84,016 10,463
kW-mo/yr
TOTAL YEARLY COSTS $448,587
RECOMMENDED SAVINGS* $23,813 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Raw Material Savings
01 3.8132: Use less toxic and volatile solvent substitutes $10,355 $550 $10,291
127,052
kWh
- $64
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,502 $3,171 $4,322
53,359
kWh
$1,180
-
kW-mo/yr
-
03 2.4133: Use most efficient type of electric motors $1,195 $6,000 $1,195
14,756
kWh
- -
04 2.4321: Upgrade obsolete equipment $6,761 $41,925 $6,761
83,467
kWh
- -
TOTAL RECOMMENDED $23,813 $51,646 $22,569
278,634
kWh
$1,180
-
kW-mo/yr
$64
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs