| Assessment Year | 2021 |
|---|---|
| Principal Product | Processed Shrimp |
| NAICS | 311710: Seafood Product Preparation and Packaging |
| SIC | 2092: Prepared Fresh or Frozen Fish and Seafoods |
| Sales Range | $50 M to 100M |
| # of Employees | 95 |
| Plant Area |
45,000
ft2
|
| Annual Production | 20,000,000
lb
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | Louisiana |
| View Case Study | |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $255,787 | 4,220,852 |
kWh
|
$0.061 |
| Electricity Demand | $38,109 | 9,250 |
kW-mo/yr
|
$4.12 |
| TOTAL YEARLY COSTS | $293,896 | |||
| RECOMMENDED SAVINGS* | $114,604 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $5,122 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $169 | $25 |
$169
2,788
kWh
|
- | - | |
| 02 | 2.7124: Make a practice of turning off lights when not needed | $1,804 | $300 |
$1,804
29,761
kWh
|
- | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,586 | $585 |
$2,586
42,680
kWh
|
- | - | |
| 04 | 4.441: Install automatic packing equipment | $109,280 | $30,730 | - | - | $109,280 | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $563 | $363 |
$472
7,795
kWh
|
$91
-
kW-mo/yr
|
- | |
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $202 | $427 |
$202
3,330
kWh
|
- | - | |
| TOTAL RECOMMENDED | $114,604 | $32,430 |
$5,233
86,354
kWh
|
$91
-
kW-mo/yr
|
$109,280 | ||
| TOTAL IMPLEMENTED | $5,122 | $1,273 |
$5,031
83,024
kWh
|
$91
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs