| Assessment Year | 2001 |
|---|---|
| Principal Product | composite products for medical and aerospace |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 65 |
| Plant Area |
40,000
ft2
|
| Annual Production | 5,000
pieces
|
| Production Hrs. Annual | 4,590
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $75,998 | 1,003,094 |
kWh
|
$0.076 |
| Electricity Demand | $35,364 | 4,386 |
kW-mo/yr
|
$8.06 |
| Electricity Fees | $2,564 | - |
|
- |
| Natural Gas | $6,414 | 943 |
MMBtu
|
$6.80 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $100,149 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $53,617 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Increase in Production Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $14,800 | $225 | - | - | - | $14,800 | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,389 | $450 |
$4,664
60,510
kWh
|
$725
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,601 | - |
$1,352
17,525
kWh
|
$249
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown | $8,671 | $13,000 |
$7,099
92,081
kWh
|
$1,572
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.7145: Install skylights | $952 | $2,000 |
$568
7,368
kWh
|
$384
-
kW-mo/yr
|
- | - | - | |
| 06 | 4.454: Modify startup/shutdown times | $11,340 | $1,000 | - | - | $11,340 | - | - | |
| 07 | 4.111: Add equipment/ operators to reduce production bottleneck | $48,228 | $25,000 | - | - | - | - | $48,228 | |
| 08 | 4.122: Develop standard procedures to improve internal yields | $9,168 | $1,961 | - | - | $9,168 | - | - | |
| TOTAL RECOMMENDED | $100,149 | $43,636 |
$13,683
177,484
kWh
|
$2,930
-
kW-mo/yr
|
$20,508 | $14,800 | $48,228 | ||
| TOTAL IMPLEMENTED | $53,617 | $25,450 |
$4,664
60,510
kWh
|
$725
-
kW-mo/yr
|
- | - | $48,228 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Increase in Production Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs