Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Titanium Tubing
NAICS 335929: Other Communication and Energy Wire Manufacturing
SIC 3356: Rolling, Drawing, and Extruding of Nonferrous Metals, Except Copper and Aluminum
Sales Range $50
M
to 100
M
# of Employees 140
Plant Area 145,000
ft2
Annual Production 4,000
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $849,253 10,410,649
kWh
Electricity Fees $27,336 -
Natural Gas $403,917 53,035
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $66,978 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,545

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.2135: Repair and eliminate steam leaks $36,904 $5,110 - - $36,904
-
MMBtu
-
02 2.2441: Preheat boiler makeup water with waste process heat $18,692 $24,500 - - $18,692
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,639 $840 $3,523
44,237
kWh
$116 - -
04 2.2511: Insulate bare equipment $3,002 $1,635 - - $3,002
-
MMBtu
-
05 2.4239: Eliminate or reduce compressed air usage $2,043 $1,588 $1,978
24,837
kWh
$65 - -
06 2.6211: Conserve energy by efficient use of vending machines $1,244 $1,402 $1,204
15,120
kWh
$40 - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $997 $630 $458
5,746
kWh
$15 - $524
08 2.7142: Utilize higher efficiency lamps and/or ballasts $457 $218 $442
5,544
kWh
$15 - -
TOTAL RECOMMENDED $66,978 $35,923 $7,605
95,484
kWh
$251 $58,598
-
MMBtu
$524
TOTAL IMPLEMENTED $43,545 $7,585 $3,523
44,237
kWh
$116 $39,906
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs