Assessment Year | 2008 |
---|---|
Principal Product | Titanium Tubing |
NAICS | 335929: Other Communication and Energy Wire Manufacturing |
SIC | 3356: Rolling, Drawing, and Extruding of Nonferrous Metals, Except Copper and Aluminum |
Sales Range | $50 M to 100M |
# of Employees | 140 |
Plant Area |
145,000
ft2
|
Annual Production | 4,000
thousand feet
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $849,253 | 10,410,649 |
kWh
|
$0.082 |
Electricity Fees | $27,336 | - |
|
- |
Natural Gas | $403,917 | 53,035 |
MMBtu
|
$7.62 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $66,978 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $43,545 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2135: Repair and eliminate steam leaks | $36,904 | $5,110 | - | - |
$36,904
-
MMBtu
|
- | |
02 | 2.2441: Preheat boiler makeup water with waste process heat | $18,692 | $24,500 | - | - |
$18,692
-
MMBtu
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,639 | $840 |
$3,523
44,237
kWh
|
$116 | - | - | |
04 | 2.2511: Insulate bare equipment | $3,002 | $1,635 | - | - |
$3,002
-
MMBtu
|
- | |
05 | 2.4239: Eliminate or reduce compressed air usage | $2,043 | $1,588 |
$1,978
24,837
kWh
|
$65 | - | - | |
06 | 2.6211: Conserve energy by efficient use of vending machines | $1,244 | $1,402 |
$1,204
15,120
kWh
|
$40 | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $997 | $630 |
$458
5,746
kWh
|
$15 | - | $524 | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $457 | $218 |
$442
5,544
kWh
|
$15 | - | - | |
TOTAL RECOMMENDED | $66,978 | $35,923 |
$7,605
95,484
kWh
|
$251 |
$58,598
-
MMBtu
|
$524 | ||
TOTAL IMPLEMENTED | $43,545 | $7,585 |
$3,523
44,237
kWh
|
$116 |
$39,906
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs