ITAC Assessment: LL0245
ITAC logo
ITAC Assessment: LL0245
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product HF and Genetron
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 625,000
ft2
Annual Production 163,000
ton
Production Hrs. Annual 8,736
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $8,226,184 153,691,694
kWh
Electricity Demand $2,465,328 240,373
kW-mo/yr
Natural Gas $17,911,478 2,010,024
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,309,584 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,715,248

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.1231: Establish burner maintenance schedule for boilers $3,334,582 $60,000 - - $3,334,582
-
MMBtu
-
02 2.3412: Use waste heat to produce steam to drive a steam turbine-generator $2,369,946 $5,024,000 $4,688,352
87,600,000
kWh
$1,231,200
-
kW-mo/yr
$(-3,549,606.0)
-
MMBtu
-
03 2.2135: Repair and eliminate steam leaks $323,360 $14,100 - - $323,360
-
MMBtu
-
04 2.2511: Insulate bare equipment $185,638 $4,644 - - $185,638
-
MMBtu
-
05 2.7134: Use photocell controls $45,203 $6,300 $45,203
844,595
kWh
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $32,924 $11,000 $32,924
615,165
kWh
- - -
07 2.2511: Insulate bare equipment $12,103 $1,218 - - $12,103
-
MMBtu
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $4,818 $3,500 $1,782
33,288
kWh
- - $3,036
09 2.7135: Install occupancy sensors $1,010 $2,813 $1,010
18,865
kWh
- - -
TOTAL RECOMMENDED $6,309,584 $5,127,575 $4,769,271
89,111,913
kWh
$1,231,200
-
kW-mo/yr
$306,077
-
MMBtu
$3,036
TOTAL IMPLEMENTED $3,715,248 $81,618 $45,203
844,595
kWh
- $3,670,045
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs