ITAC Assessment: LL0237
ITAC logo
ITAC Assessment: LL0237
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Particle board
NAICS 321219: Reconstituted Wood Product Manufacturing
SIC 2493: Reconstituted Wood Products
Sales Range $50
M
to 100
M
# of Employees 189
Plant Area 278,000
ft2
Annual Production 350,000
thousand feet
Production Hrs. Annual 8,736
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,500,000 49,852,800
kWh
Electricity Demand $691,681 91,077
kW-mo/yr
Electricity Fees $128,454 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,264,365 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $134,684

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Wood Savings Personnel Changes Savings
01 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat $3,092,622 - $2,428,662
49,416,000
kWh
$546,480
-
kW-mo/yr
$117,480 - -
02 2.2511: Insulate bare equipment $46,200 $2,600 - - - $46,200
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $51,555 $15,000 $49,716
991,343
kWh
- $1,839 - -
04 2.7111: Reduce illumination to minimum necessary levels $34,402 $1,400 $27,391
546,172
kWh
$5,784
-
kW-mo/yr
$1,227 - -
05 2.7134: Use photocell controls $22,793 - $21,980
438,292
kWh
- $813 - -
06 2.4239: Eliminate or reduce compressed air usage $13,071 - $12,605
251,348
kWh
- $466 - -
07 2.7135: Install occupancy sensors $1,195 - $1,152
22,963
kWh
- $43 - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,527 $1,930 $885
17,643
kWh
- $33 - $1,609
TOTAL RECOMMENDED $3,264,365 $20,930 $2,542,391
51,683,761
kWh
$552,264
-
kW-mo/yr
$121,901 $46,200
-
MMBtu
$1,609
TOTAL IMPLEMENTED $134,684 $20,930 $77,992
1,555,158
kWh
$5,784
-
kW-mo/yr
$3,099 $46,200
-
MMBtu
$1,609
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Wood Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs