ITAC Assessment: LL0226
ITAC logo
ITAC Assessment: LL0226
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Rice Drying
NAICS 311212: Rice Milling
SIC 2044: Rice Milling
Sales Range $500
k
to 1
M
# of Employees 11
Plant Area 25,000
ft2
Annual Production 10,816,000
lb
Production Hrs. Annual 3,984
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,800 444,570
kWh
Electricity Demand $9,800 2,467
kW-mo/yr
Electricity Fees $2,189 -
Natural Gas $38,387 6,701
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,594 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,994

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,228 $1,600 $6,000
55,802
kWh
- $228 - - -
02 2.2511: Insulate bare equipment $6,074 - - - - $6,074
-
MMBtu
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,146 $700 $993
9,238
kWh
$111
-
kW-mo/yr
$42 - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $745 $300 - - - $745
-
MMBtu
- -
05 2.7134: Use photocell controls $464 - $447
4,156
kWh
- $17 - - -
06 2.7135: Install occupancy sensors $62 - $60
560
kWh
- $2 - - -
07 4.611: Begin a practice of predictive / preventative maintenance $3,875 $350 - - - - $1,375 $2,500
TOTAL RECOMMENDED $18,594 $2,950 $7,500
69,756
kWh
$111
-
kW-mo/yr
$289 $6,819
-
MMBtu
$1,375 $2,500
TOTAL IMPLEMENTED $11,994 $2,950 $6,993
65,040
kWh
$111
-
kW-mo/yr
$270 $745
-
MMBtu
$1,375 $2,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs