Assessment Year | 2005 |
---|---|
Principal Product | Oilfield Equipment |
NAICS | 333132: Oil and Gas Field Machinery and Equipment Manufacturing |
SIC | 3533: Oil and Gas Field Machinery and Equipment |
Sales Range | $100 M to 500M |
# of Employees | 250 |
Plant Area |
225,000
ft2
|
Annual Production | 6,000
pieces
|
Production Hrs. Annual | 5,824
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $333,249 | 7,193,129 |
kWh
|
$0.046 |
Electricity Demand | $115,777 | 14,402 |
kW-mo/yr
|
$8.04 |
Electricity Fees | $17,097 | - |
|
- |
Natural Gas | $164,004 | 17,693 |
MMBtu
|
$9.27 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $338,316 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $312,447 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (haz) Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $49,904 | $26,850 |
$48,077
1,037,703
kWh
|
- | $1,827 | - | - | - | - | |
02 | 2.7232: Replace existing hvac unit with high efficiency model | $38,931 | $18,717 | - | - | - |
$38,931
-
MMBtu
|
- | - | - | |
03 | 2.7243: Improve air circulation with destratification fans / other methods | $18,345 | $4,495 |
$17,673
385,731
kWh
|
- | $672 | - | - | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $10,142 | $60 |
$9,771
210,896
kWh
|
- | $371 | - | - | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,865 | $3,360 |
$8,540
184,324
kWh
|
- | $325 | - | - | - | - | |
06 | 2.7111: Reduce illumination to minimum necessary levels | $7,000 | $465 |
$5,539
119,549
kWh
|
$1,205
-
kW-mo/yr
|
$256 | - | - | - | - | |
07 | 2.2511: Insulate bare equipment | $1,372 | $570 | - | - | - |
$1,372
-
MMBtu
|
- | - | - | |
08 | 2.7134: Use photocell controls | $1,919 | $180 |
$1,849
39,911
kWh
|
- | $70 | - | - | - | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,270 | $1,581 |
$1,702
36,734
kWh
|
$485
-
kW-mo/yr
|
$83 | - | - | - | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $695 | $525 |
$231
4,993
kWh
|
- | $9 | - | - | $455 | - | |
11 | 2.7135: Install occupancy sensors | $524 | $90 |
$505
10,909
kWh
|
- | $19 | - | - | - | - | |
12 | 3.5311: Recover and reuse waste material | $11,259 | $18,500 | - | - | - | - |
$4,239
-
gal
|
$7,020 | - | |
13 | 4.611: Begin a practice of predictive / preventative maintenance | $184,840 | $1,190 | - | - | - | - | - | $180,840 | $4,000 | |
14 | 4.611: Begin a practice of predictive / preventative maintenance | $2,250 | $1,486 | - | - | - | - | - | $2,250 | - | |
TOTAL RECOMMENDED | $338,316 | $78,069 |
$93,887
2,030,750
kWh
|
$1,690
-
kW-mo/yr
|
$3,632 |
$40,303
-
MMBtu
|
$4,239
-
gal
|
$190,565 | $4,000 | ||
TOTAL IMPLEMENTED | $312,447 | $73,019 |
$70,170
1,514,561
kWh
|
$485
-
kW-mo/yr
|
$2,685 |
$40,303
-
MMBtu
|
$4,239
-
gal
|
$190,565 | $4,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (haz) Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs