| Assessment Year | 2024 |
|---|---|
| Principal Product | Plastic Acrylic File |
| NAICS | 326130: Laminated Plastics Plate, Sheet (except Packaging), and Shape Manufacturing |
| SIC | 3083: Laminated Plastics Plate, Sheet, and Profile Shapes |
| Sales Range | $10 M to 50M |
| # of Employees | 19 |
| Plant Area |
30,000
ft2
|
| Annual Production | 120,000
lb
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | New Jersey |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $110,573 | 791,049 |
kWh
|
$0.14 |
| Electricity Demand | $31,888 | 4,059 |
kW-mo/yr
|
$7.86 |
| Electricity Fees | $4,450 | - |
|
- |
| Natural Gas | $48,118 | 5,985 |
MMBtu
|
$8.04 |
| TOTAL YEARLY COSTS | $195,029 | |||
| RECOMMENDED SAVINGS* | $35,732 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Raw Material Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,626 | $100 |
$1,398
9,984
kWh
|
$228
-
kW-mo/yr
|
- | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $12,473 | $1,400 |
$10,735
76,676
kWh
|
$1,738
-
kW-mo/yr
|
- | - | |
| 03 | 2.2136: Install / repair insulation on steam lines | $3,883 | $1,832 | - | - |
$3,883
-
MMBtu
|
- | |
| 04 | 2.4322: Use or replace with energy efficient substitutes | $14,950 | $12,995 |
$910
6,500
kWh
|
- | - | $14,040 | |
| 05 | 2.7232: Replace existing hvac unit with high efficiency model | $1,803 | $5,143 |
$1,599
11,424
kWh
|
$204
-
kW-mo/yr
|
- | - | |
| 06 | 2.7232: Replace existing hvac unit with high efficiency model | $997 | $3,220 |
$792
5,658
kWh
|
$205
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $35,732 | $24,690 |
$15,434
110,242
kWh
|
$2,375
-
kW-mo/yr
|
$3,883
-
MMBtu
|
$14,040 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Raw Material Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs