ITAC Assessment: LE0553
ITAC logo
ITAC Assessment: LE0553
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Plastic sewer pipe
NAICS 326122: Plastics Pipe and Pipe Fitting Manufacturing
SIC 3084: Plastics Pipe
Sales Range $100
M
to 500
M
# of Employees 65
Plant Area 22,000
ft2
Annual Production 15,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $419,920 8,388,913
kWh
Electricity Demand $81,447 14,954
kW-mo/yr
Electricity Fees $15,821 -
LPG $12,400 1,031
MMBtu
TOTAL YEARLY COSTS $529,588
RECOMMENDED SAVINGS* $51,175 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.2511: Insulate bare equipment $547 $270 $416
8,320
kWh
$131
-
kW-mo/yr
-
02 2.2511: Insulate bare equipment $561 $416 $554
11,058
kWh
$7
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $21,093 $22,500 $18,346
336,912
kWh
$2,747
-
kW-mo/yr
-
04 2.2628: Utilize a less expensive cooling method $8,974 $40,000 $7,862
157,248
kWh
$1,112
-
kW-mo/yr
-
05 2.4133: Use most efficient type of electric motors $20,000 $91,800 - - $20,000
TOTAL RECOMMENDED $51,175 $154,986 $27,178
513,538
kWh
$3,997
-
kW-mo/yr
$20,000
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs