ITAC Assessment: LE0404
ITAC logo
ITAC Assessment: LE0404
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product paper converter
NAICS 322299: All Other Converted Paper Product Manufacturing
SIC 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 130
Plant Area 800,000
ft2
Annual Production 75,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $199,050 2,126,260
kWh
Electricity Demand $26,163 7,299
kW-mo/yr
Electricity Fees $22,106 -
Natural Gas $13,463 1,105
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,079 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,943

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.2136: Install / repair insulation on steam lines $1,045 $276 $1,045
10,886
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,623 $1,000 $2,380
24,791
kWh
$243
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $7,827 $4,800 $7,827
81,536
kWh
- -
04 2.7135: Install occupancy sensors $92 $240 $92
955
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $5,793 $17,019 $4,589
47,798
kWh
$329
-
kW-mo/yr
$875
06 2.7142: Utilize higher efficiency lamps and/or ballasts $8,569 $36,281 $6,589
68,640
kWh
$709
-
kW-mo/yr
$1,271
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,130 $6,092 $1,065
11,095
kWh
$64
-
kW-mo/yr
-
TOTAL RECOMMENDED $27,079 $65,708 $23,587
245,701
kWh
$1,346
-
kW-mo/yr
$2,146
TOTAL IMPLEMENTED $25,943 $65,192 $22,451
233,860
kWh
$1,346
-
kW-mo/yr
$2,146
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs