Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Pharmaceuticals
NAICS 325411: Medicinal and Botanical Manufacturing
SIC 2833: Medicinal Chemicals and Botanical Products
Sales Range $5
M
to 10
M
# of Employees 80
Plant Area 32,000
ft2
Annual Production 22
lb
Production Hrs. Annual 2,500
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $184,656 2,089,440
kWh
Electricity Demand $34,230 5,038
kW-mo/yr
Natural Gas $103,182 9,421
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,897 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,632

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Consumption Savings
01 2.8113: Purchase gas directly from a contract gas supplier $20,632 $500 - - $20,632
-
MMBtu
-
02 2.7314: Reduce ventilation air $6,676 $200 $6,676
75,862
kWh
- - -
03 2.3134: Shift from daytime to nighttime operation $4,200 $200 - $4,200
-
kW-mo/yr
- -
04 2.2414: Use waste heat from hot flue gases to preheat $3,761 $6,000 - - $3,761
-
MMBtu
-
05 2.6212: Turn off equipment during breaks, reduce operating time $3,628 $500 $328
3,730
kWh
- - $3,300
-
Tgal
TOTAL RECOMMENDED $38,897 $7,400 $7,004
79,592
kWh
$4,200
-
kW-mo/yr
$24,393
-
MMBtu
$3,300
-
Tgal
TOTAL IMPLEMENTED $20,632 $500 - - $20,632
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs