ITAC Assessment: KU0458
ITAC logo
ITAC Assessment: KU0458
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product screen-printed T-shirts
NAICS
n/a
SIC 2396: Automotive Trimmings, Apparel Findings, and Related Products
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 45,000
ft2
Annual Production 1,500,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,848 832,649
kWh
Electricity Demand $29,564 4,286
kW-mo/yr
Natural Gas $9,236 1,982
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $96,159 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,791

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $50,368 $147,448 $41,102
604,631
kWh
$24,364
-
kW-mo/yr
$(-15,098.0)
-
MMBtu
-
02 2.6218: Turn off equipment when not in use $35,563 $2,800 $31,796
467,761
kWh
$3,767
-
kW-mo/yr
- -
03 3.5311: Recover and reuse waste material $6,111 - - - - $6,111
-
lb
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,935 $4,856 $1,393
20,516
kWh
$542
-
kW-mo/yr
- -
05 2.7135: Install occupancy sensors $1,402 $850 $1,402
20,516
kWh
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $780 $257 $566
8,206
kWh
$214
-
kW-mo/yr
- -
TOTAL RECOMMENDED $96,159 $156,211 $76,259
1,121,630
kWh
$28,887
-
kW-mo/yr
$(-15,098.0)
-
MMBtu
$6,111
-
lb
TOTAL IMPLEMENTED $45,791 $8,763 $35,157
516,999
kWh
$4,523
-
kW-mo/yr
- $6,111
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs