ITAC Assessment: KU0412
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Industrial Vehicles
NAICS
n/a
SIC 3711: Motor Vehicles and Passenger Car Bodies
Sales Range $50
M
to 100
M
# of Employees 500
Plant Area 600,000
ft2
Annual Production 16,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $372,403 8,957,210
kWh
Natural Gas $198,160 42,474
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,618 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,003

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,619 $53,048 $6,619
159,144
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $122 $480 $122
2,931
kWh
- -
03 3.4114: Replace city water with recycled water via cooling tower $12,010 $17,000 $(-683.0)
(-16,413)
kWh
- $12,693
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,454 $190 $1,454
29,015
kWh
- -
05 3.4115: Recover and reuse cooling water $11,879 $200 - - $11,879
06 2.2437: Recover waste heat from equipment $6,463 $8,750 - $6,463
-
MMBtu
-
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,133 $20,000 $7,669
123,681
kWh
$(-2,536.0)
-
MMBtu
-
08 2.3191: Use demand controller or load shedder $1,964 $6,000 $1,964
-
kWh
- -
09 2.4314: Use synthetic lubricant $1,426 - $1,426
34,291
kWh
- -
10 2.4133: Use most efficient type of electric motors $548 $946 $548
13,189
kWh
- -
TOTAL RECOMMENDED $47,618 $106,614 $19,119
345,838
kWh
$3,927
-
MMBtu
$24,572
TOTAL IMPLEMENTED $14,003 $1,816 $2,124
45,135
kWh
- $11,879
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs