ITAC Assessment: KU0323
ITAC logo
ITAC Assessment: KU0323
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product ENVIRONMENTAL EQUIPMENT
NAICS
n/a
SIC 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products
Sales Range $10
M
to 50
M
# of Employees 500
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,250
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $206,400 4,215,416
kWh
Natural Gas $19,101 4,424
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,593 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $201

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7141: Lower light fixtures in high ceiling areas $832 $987 $832
16,999
kWh
02 2.7111: Reduce illumination to minimum necessary levels $560 $220 $560
11,430
kWh
03 2.2511: Insulate bare equipment $201 $120 $201
4,103
kWh
TOTAL RECOMMENDED $1,593 $1,327 $1,593
32,532
kWh
TOTAL IMPLEMENTED $201 $120 $201
4,103
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs