ITAC Assessment: KU0271
ITAC logo
ITAC Assessment: KU0271
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product CORRUGATED CONTAINERS
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 113
Plant Area
n/a
Annual Production 1,100,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $263,547 5,871,043
kWh
Natural Gas $245,004 71,286
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,815 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,347

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2414: Use waste heat from hot flue gases to preheat $1,720 $6,000 - $1,720
-
MMBtu
-
02 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $5,826 $297 $5,826
129,836
kWh
- -
03 2.1232: Keep boiler tubes clean $5,300 $1,500 - $7,100
-
MMBtu
$(-1,800.0)
04 2.2511: Insulate bare equipment $3,940 $900 - $3,940
-
MMBtu
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,327 $6,000 $3,327
74,150
kWh
- -
06 2.7231: Use radiant heater for spot heating $3,371 $6,000 - $3,371
-
MMBtu
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $2,406 $100 $2,406
53,634
kWh
- -
08 2.4133: Use most efficient type of electric motors $4,370 $7,134 $4,370
97,304
kWh
- -
09 2.1233: Analyze flue gas for proper air/fuel ratio $1,445 $1,500 - $4,045
-
MMBtu
$(-2,600.0)
10 3.4113: Treat and reuse rinse waters $1,110 $1,500 - - $1,110
TOTAL RECOMMENDED $32,815 $30,931 $15,929
354,924
kWh
$20,176
-
MMBtu
$(-3,290.0)
TOTAL IMPLEMENTED $19,347 $10,531 $12,602
280,774
kWh
$11,145
-
MMBtu
$(-4,400.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs