ITAC Assessment: KU0197
ITAC logo
ITAC Assessment: KU0197
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product RESTAURANT BOOTH SEATING
NAICS
n/a
SIC 2541: Wood Office and Store Fixtures, Partitions, Shelving, and Lockers
Sales Range $1
M
to 5
M
# of Employees 63
Plant Area
n/a
Annual Production 500
thousand feet
Production Hrs. Annual 2,210
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $16,653 159,144
kWh
Natural Gas $6,592 1,451
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,345 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,345

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,730 $2,554 $2,730
26,084
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,331 $380 $2,331
22,274
kWh
- -
03 2.2532: Use only amount of air necessary to prevent explosion hazard $449 $14 $31
293
kWh
$418
-
MMBtu
-
04 2.1123: Install automatic stack damper $440 $700 - $440
-
MMBtu
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $170 - - $350
-
MMBtu
$(-180.0)
06 2.7221: Lower temperature during the winter season and vice-versa $225 $40 $184
1,758
kWh
$41
-
MMBtu
-
TOTAL RECOMMENDED $6,345 $3,688 $5,276
50,409
kWh
$1,249
-
MMBtu
$(-180.0)
TOTAL IMPLEMENTED $6,345 $3,688 $5,276
50,409
kWh
$1,249
-
MMBtu
$(-180.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs