ITAC Assessment: KG0015
ITAC logo
ITAC Assessment: KG0015
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Seat belts
NAICS
n/a
SIC 3082: Unsupported Plastics Profile Shapes
Sales Range $1
M
to 5
M
# of Employees 65
Plant Area 22,000
ft2
Annual Production 8,000,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,946 1,563,306
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,200 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,198

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $6,992 - $6,992
58,910
kWh
02 2.2511: Insulate bare equipment $3,720 $118 $3,720
60,375
kWh
03 2.4133: Use most efficient type of electric motors $1,824 $2,390 $1,824
35,463
kWh
04 2.7233: Use properly designed and sized hvac equipment $1,458 $2,300 $1,458
44,549
kWh
05 2.4231: Reduce the pressure of compressed air to the minimum required $799 $15 $799
24,326
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $407 $162 $407
12,603
kWh
TOTAL RECOMMENDED $15,200 $4,985 $15,200
236,226
kWh
TOTAL IMPLEMENTED $8,198 $177 $8,198
95,839
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs