ITAC Assessment: IP0216
ITAC logo
ITAC Assessment: IP0216
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Metal Orthopedic Industry
NAICS 339113: Surgical Appliance and Supplies Manufacturing
SIC 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies
Sales Range $10
M
to 50
M
# of Employees 37
Plant Area 44,315
ft2
Annual Production 1,740,000
lb
Production Hrs. Annual 4,420
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $97,679 1,386,900
kWh
Electricity Demand $61,776 5,482
kW-mo/yr
Electricity Fees $32,833 -
Natural Gas $10,820 1,513
MMBtu
Waste Disposal Costs
Water Usage $4,975 131,698
Tgal
TOTAL YEARLY COSTS $208,083
RECOMMENDED SAVINGS* $21,774 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4239: Eliminate or reduce compressed air usage $4,771 - $3,317
47,383
kWh
$1,454
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $238 $118 $238
3,394
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,912 $969 $1,330
19,006
kWh
$582
-
kW-mo/yr
04 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $14,853 $8,928 $10,334
147,628
kWh
$4,519
-
kW-mo/yr
TOTAL RECOMMENDED $21,774 $10,015 $15,219
217,411
kWh
$6,555
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs