ITAC Assessment: IP0182
ITAC logo
ITAC Assessment: IP0182
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Automotive Seating and Interior
NAICS 336360: Motor Vehicle Seating and Interior Trim Manufacturing
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 48
Plant Area 35,000
ft2
Annual Production 60,000
units
Production Hrs. Annual 2,730
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $196,515 1,006,000
kWh
Electricity Demand $14,361 2,190
kW-mo/yr
Electricity Fees $414 -
Natural Gas $16,658 1,534
MMBtu
TOTAL YEARLY COSTS $227,948
RECOMMENDED SAVINGS* $7,359 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $3,142 - $2,818
14,450
kWh
$324
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,891 $50 $1,666
8,544
kWh
$225
-
kW-mo/yr
03 2.7135: Install occupancy sensors $203 $172 $203
1,042
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $950 $1,284 $827
4,242
kWh
$123
-
kW-mo/yr
05 2.7232: Replace existing hvac unit with high efficiency model $1,173 $6,828 $1,022
5,242
kWh
$151
-
kW-mo/yr
TOTAL RECOMMENDED $7,359 $8,334 $6,536
33,520
kWh
$823
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs