ITAC Assessment: IP0162
ITAC logo
ITAC Assessment: IP0162
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Molded Pulp Packaging
NAICS 322299: All Other Converted Paper Product Manufacturing
SIC 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 67
Plant Area 108,000
ft2
Annual Production 16,000
ton
Production Hrs. Annual 7,320
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $360,104 5,197,365
kWh
Electricity Demand $101,814 8,646
kW-mo/yr
Electricity Fees $18,039 -
LPG $170,848 9,524
MMBtu
Other Gas $242,853 122,473
MMBtu
Waste Disposal Costs
Water Usage $61,778 115,967
Tgal
TOTAL YEARLY COSTS $955,436
RECOMMENDED SAVINGS* $62,834 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $57,245

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings One-time Revenue or Avoided Cost Savings
01 2.7221: Lower temperature during the winter season and vice-versa $1,109 $12 $481
6,978
kWh
- $628
-
MMBtu
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $8,724 $1,255 $6,819
98,825
kWh
$1,905
-
kW-mo/yr
- -
03 2.4239: Eliminate or reduce compressed air usage $634 $152 $634
9,185
kWh
- - -
04 2.7135: Install occupancy sensors $377 $137 $377
5,470
kWh
- - -
05 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $45,478 $37,072 - - $45,478
-
MMBtu
-
06 2.8121: Apply for tax-free status for energy purchases $5,589 $8,000 - - - $5,589
07 2.7142: Utilize higher efficiency lamps and/or ballasts $923 $2,186 $683
9,900
kWh
$240
-
kW-mo/yr
- -
TOTAL RECOMMENDED $62,834 $48,814 $8,994
130,358
kWh
$2,145
-
kW-mo/yr
$46,106
-
MMBtu
$5,589
TOTAL IMPLEMENTED $57,245 $40,814 $8,994
130,358
kWh
$2,145
-
kW-mo/yr
$46,106
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs