ITAC Assessment: IP0151
ITAC logo
ITAC Assessment: IP0151
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product steering components
NAICS 336330: Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 360
Plant Area 224,000
ft2
Annual Production 917,500
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $445,543 8,215,339
kWh
Electricity Demand $234,719 15,636
kW-mo/yr
Natural Gas $123,608 47,181
MMBtu
Waste Disposal Costs
Water Usage $27,656 11,906
Tgal
TOTAL YEARLY COSTS $831,526
RECOMMENDED SAVINGS* $56,801 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,801

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7224: Reduce space conditioning during non-working hours $759 $18 $357
6,589
kWh
- $402
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,626 $271 $6,423
118,510
kWh
$203
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $2,159 $767 $2,159
39,835
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $20,612 $34,884 $19,981
368,647
kWh
$632
-
kW-mo/yr
-
05 2.1224: Replace boiler $26,645 $57,558 - - $26,645
-
MMBtu
TOTAL RECOMMENDED $56,801 $93,497 $28,920
533,581
kWh
$835
-
kW-mo/yr
$27,047
-
MMBtu
TOTAL IMPLEMENTED $56,801 $93,497 $28,920
533,581
kWh
$835
-
kW-mo/yr
$27,047
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs