ITAC Assessment: IP0147
ITAC logo
ITAC Assessment: IP0147
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Pellet Ring Dies
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 74,080
ft2
Annual Production 2,383
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $132,283 4,531,105
kWh
Electricity Demand $330,515 13,816
kW-mo/yr
Electricity Fees $10,365 -
Natural Gas $23,673 5,196
MMBtu
Waste Disposal Costs
Water Usage $17,057 3,466
Tgal
TOTAL YEARLY COSTS $513,892
RECOMMENDED SAVINGS* $23,206 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,678

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6211: Conserve energy by efficient use of vending machines $528 - $248
8,541
kWh
$280
-
kW-mo/yr
-
02 2.7224: Reduce space conditioning during non-working hours $4,540 $15 $374
12,912
kWh
- $4,166
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,380 $115 $648
22,343
kWh
$732
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $13,949 $4,080 $13,949
481,000
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,770 $3,499 $2,770
95,519
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $39 $90 $2
65
kWh
$37
-
kW-mo/yr
-
TOTAL RECOMMENDED $23,206 $7,799 $17,991
620,380
kWh
$1,049
-
kW-mo/yr
$4,166
-
MMBtu
TOTAL IMPLEMENTED $22,678 $7,799 $17,743
611,839
kWh
$769
-
kW-mo/yr
$4,166
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs