ITAC Assessment: IP0023
ITAC logo
ITAC Assessment: IP0023
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Sour Punch, Snaps, Super Ropes Brand Confections
NAICS 311340: Nonchocolate Confectionery Manufacturing
SIC 2064: Candy and Other Confectionery Products
Sales Range $10
M
to 50
M
# of Employees 255
Plant Area 280,000
ft2
Annual Production 16,000,000
pieces
Production Hrs. Annual 5,736
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $300,930 5,168,160
kWh
Electricity Demand $135,669 11,286
kW-mo/yr
Electricity Fees $9,969 -
Natural Gas $122,958 23,002
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,966 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $21,826 - $21,068
361,368
kWh
$758
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $251 - $251
4,300
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,844 $59 $2,844
48,785
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $66 $13 $46
792
kWh
$20
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $43 $30 $43
743
kWh
- -
06 2.7141: Lower light fixtures in high ceiling areas $2,202 $1,970 $1,538
26,386
kWh
$664
-
kW-mo/yr
-
07 2.2311: Heat treat parts only to required specifications or standards $20,119 $16,444 $(-6,128.0)
(-105,120)
kWh
- $26,247
-
MMBtu
08 2.4131: Size electric motors for peak operating efficiency $2,491 $2,716 $1,533
26,300
kWh
$958
-
kW-mo/yr
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $124 $245 $87
1,486
kWh
$37
-
kW-mo/yr
-
TOTAL RECOMMENDED $49,966 $21,476 $21,282
365,040
kWh
$2,437
-
kW-mo/yr
$26,247
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs