ITAC Assessment: IP0019
ITAC logo
ITAC Assessment: IP0019
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Rigid Jewelry Boxes
NAICS 322212: Folding Paperboard Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 72
Plant Area 29,000
ft2
Annual Production 37,125,805
pieces
Production Hrs. Annual 2,570
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,412 629,288
kWh
Natural Gas $5,075 705
MMBtu
Other Gas $7,214 168
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,031 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,267

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings One-time Revenue or Avoided Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $1,290 - - $1,290
02 4.812: Apply for investment incentives $166 - - $166
03 2.4231: Reduce the pressure of compressed air to the minimum required $493 - $493
3,855
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,885 $164 $13,885
108,473
kWh
-
05 2.7422: Plant trees or shrubs near windows to shield from sunlight $668 $715 $668
5,220
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,889 $3,258 $2,889
22,566
kWh
-
07 2.7241: Install outside air damper / economizer on hvac unit $640 $957 $640
5,001
kWh
-
TOTAL RECOMMENDED $20,031 $5,094 $18,575
145,115
kWh
$1,456
TOTAL IMPLEMENTED $17,267 $3,422 $17,267
134,894
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs