ITAC Assessment: IP0014
ITAC logo
ITAC Assessment: IP0014
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Lithium Ion Cells, Modules, Packs, Systems and Battery Management
NAICS 335912: Primary Battery Manufacturing
SIC 3692: Primary Batteries, Dry and Wet
Sales Range $10
M
to 50
M
# of Employees 48
Plant Area 65,883
ft2
Annual Production 615
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $220,638 8,232,750
kWh
Electricity Demand $170,586 16,757
kW-mo/yr
Natural Gas $133,702 18,145
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,417 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,803

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $25,849 - - - $19,186 - $6,663
02 2.7221: Lower temperature during the winter season and vice-versa $3,997 - - - - $3,997
-
MMBtu
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,183 - $666
24,849
kWh
$1,517
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,360 - $1,360
50,742
kWh
- - - -
05 2.6218: Turn off equipment when not in use $263 - $263
9,806
kWh
- - - -
06 2.7135: Install occupancy sensors $1,409 $58 $1,409
52,559
kWh
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $5,703 $2,128 $1,739
64,900
kWh
$3,964
-
kW-mo/yr
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $653 $1,081 $199
7,440
kWh
$454
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $41,417 $3,267 $5,636
210,296
kWh
$5,935
-
kW-mo/yr
$19,186 $3,997
-
MMBtu
$6,663
TOTAL IMPLEMENTED $7,803 - $2,289
85,397
kWh
$1,517
-
kW-mo/yr
- $3,997
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs