ITAC Assessment: IC0255
ITAC logo
ITAC Assessment: IC0255
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Surgical Products
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 30,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 4,030
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $107,361 825,624
kWh
Electricity Demand $27,664 2,145
kW-mo/yr
Natural Gas $11,189 1,285
MMBtu
TOTAL YEARLY COSTS $146,214
RECOMMENDED SAVINGS* $24,997 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,539

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $18,386 $15,632 $14,193
109,173
kWh
$4,193
-
kW-mo/yr
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,458 $1,710 $3,088
19,299
kWh
$370
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,153 $4,100 $2,443
15,266
kWh
$710
-
kW-mo/yr
TOTAL RECOMMENDED $24,997 $21,442 $19,723
143,738
kWh
$5,273
-
kW-mo/yr
TOTAL IMPLEMENTED $21,539 $19,732 $16,636
124,439
kWh
$4,903
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs