Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Plastic and Metal Fab/Finishing
NAICS 332510: Hardware Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 85,000
ft2
Annual Production 6,000,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $187,044 2,717,299
kWh
Electricity Demand $52,459 6,576
kW-mo/yr
Natural Gas $132,524 26,069
MMBtu
Waste Disposal Costs
Water Usage $116,643 7,558
Tgal
Water Disposal $31,838 4,705
Tgal
TOTAL YEARLY COSTS $520,507
RECOMMENDED SAVINGS* $51,225 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.7221: Lower temperature during the winter season and vice-versa $3,360 - - - $3,360
-
MMBtu
-
02 3.4116: Meter recycled water (to reduce sewer charges) $18,213 $1,050 - - - $18,213
-
Tgal
03 2.4133: Use most efficient type of electric motors $5,005 $9,970 $2,121
35,337
kWh
$2,884
-
kW-mo/yr
- -
04 2.4133: Use most efficient type of electric motors $12,442 $24,500 $9,910
165,164
kWh
$2,532
-
kW-mo/yr
- -
05 2.1124: Replace direct fired with steam heat $12,205 $25,158 - - $12,205
-
MMBtu
-
TOTAL RECOMMENDED $51,225 $60,678 $12,031
200,501
kWh
$5,416
-
kW-mo/yr
$15,565
-
MMBtu
$18,213
-
Tgal
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs