| Assessment Year | 2018 |
|---|---|
| Principal Product | Plastic and Metal Fab/Finishing |
| NAICS | 332510: Hardware Manufacturing |
| SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 70 |
| Plant Area |
85,000
ft2
|
| Annual Production | 6,000,000
pieces
|
| Production Hrs. Annual | 4,420
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $187,044 | 2,717,299 |
kWh
|
$0.069 | |
| Electricity Demand | $52,459 | 6,576 |
kW-mo/yr
|
$7.98 | |
| Natural Gas | $132,524 | 26,069 |
MMBtu
|
$5.08 | |
| Waste Disposal Costs | |||||
| Water Usage | $116,643 | 7,558 |
Tgal
|
$15.43 | |
| Water Disposal | $31,838 | 4,705 |
Tgal
|
$6.77 | |
| TOTAL YEARLY COSTS | $520,507 | ||||
| RECOMMENDED SAVINGS* | $51,225 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7221: Lower temperature during the winter season and vice-versa | $3,360 | - | - | - |
$3,360
-
MMBtu
|
- | |
| 02 | 3.4116: Meter recycled water (to reduce sewer charges) | $18,213 | $1,050 | - | - | - |
$18,213
-
Tgal
|
|
| 03 | 2.4133: Use most efficient type of electric motors | $5,005 | $9,970 |
$2,121
35,337
kWh
|
$2,884
-
kW-mo/yr
|
- | - | |
| 04 | 2.4133: Use most efficient type of electric motors | $12,442 | $24,500 |
$9,910
165,164
kWh
|
$2,532
-
kW-mo/yr
|
- | - | |
| 05 | 2.1124: Replace direct fired with steam heat | $12,205 | $25,158 | - | - |
$12,205
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $51,225 | $60,678 |
$12,031
200,501
kWh
|
$5,416
-
kW-mo/yr
|
$15,565
-
MMBtu
|
$18,213
-
Tgal
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs