ITAC Assessment: IC0155
ITAC logo
ITAC Assessment: IC0155
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Pharmaceutical Packager
NAICS 561910: Packaging and Labeling Services
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $100
M
to 500
M
# of Employees 450
Plant Area 275,000
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 7,464
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $721,552 11,434,235
kWh
Electricity Demand $106,136 20,332
kW-mo/yr
Natural Gas $100,772 9,262
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $61,926 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $59,227

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Primary Raw Material Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $338 $525 $290
4,598
kWh
$37
-
kW-mo/yr
$55 $(-44.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $8,751 $32,000 $13,362
212,097
kWh
$1,780
-
kW-mo/yr
$(-4,936.0) $(-1,455.0)
03 2.7135: Install occupancy sensors $7,147 $6,214 $6,288
99,877
kWh
$859
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $41,354 $112,227 $22,411
355,740
kWh
$3,603
-
kW-mo/yr
$9,406 $5,934
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,637 $2,750 $817
12,965
kWh
$94
-
kW-mo/yr
$457 $269
06 2.4231: Reduce the pressure of compressed air to the minimum required $576 - $576
9,145
kWh
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,086 $1,265 $1,086
17,262
kWh
- - -
08 2.6211: Conserve energy by efficient use of vending machines $1,037 - $567
9,000
kWh
$470
-
kW-mo/yr
- -
TOTAL RECOMMENDED $61,926 $154,981 $45,397
720,684
kWh
$6,843
-
kW-mo/yr
$4,982 $4,704
TOTAL IMPLEMENTED $59,227 $153,716 $43,168
685,277
kWh
$6,373
-
kW-mo/yr
$4,982 $4,704
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs