ITAC Assessment: IC0113
ITAC logo
ITAC Assessment: IC0113
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product cold finish steel bars
NAICS 331221: Rolled Steel Shape Manufacturing
SIC 3316: Cold-Rolled Steel Sheet, Strip, and Bars
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 143,283
ft2
Annual Production 237,785,000
lb
Production Hrs. Annual 4,335
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $386,738 6,035,918
kWh
Electricity Demand $74,091 16,677
kW-mo/yr
Electricity Fees $7,133 -
Natural Gas $31,273 3,730
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $72,700 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,957

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.6218: Turn off equipment when not in use $17,370 $48,900 $(-931.0)
14,552
kWh
$(-89.0)
-
kW-mo/yr
$18,390
-
MMBtu
- -
02 2.6218: Turn off equipment when not in use $10,036 - $10,036
156,799
kWh
- - - -
03 2.4133: Use most efficient type of electric motors $15,683 $66,529 $13,199
206,249
kWh
$2,484
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,398 $8,517 $849
13,286
kWh
$232
-
kW-mo/yr
- - $317
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,840 $900 $2,381
37,188
kWh
$459
-
kW-mo/yr
- - -
06 2.8114: Change rate schedules or other changes in utility service $25,373 - - - - $25,373 -
TOTAL RECOMMENDED $72,700 $124,846 $25,534
428,074
kWh
$3,086
-
kW-mo/yr
$18,390
-
MMBtu
$25,373 $317
TOTAL IMPLEMENTED $29,957 $75,946 $26,465
413,522
kWh
$3,175
-
kW-mo/yr
- - $317
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs