Assessment Year | 2005 |
---|---|
Principal Product | Epoxies and Resins |
NAICS | 325211: Plastics Material and Resin Manufacturing |
SIC | 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
87,120
ft2
|
Annual Production | 0
Tgal
|
Production Hrs. Annual | 8,544
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $129,695 | 3,304,731 |
kWh
|
$0.039 |
Electricity Demand | $88,262 | 7,286 |
kW-mo/yr
|
$12.11 |
Electricity Fees | $2,868 | - |
|
- |
Natural Gas | $525,368 | 73,220 |
MMBtu
|
$7.18 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $105,621 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $85,290 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2136: Install / repair insulation on steam lines | $60,808 | $100,000 | - | - |
$60,808
-
MMBtu
|
- | - | - | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $7,211 | $2,000 | - | - |
$7,211
-
MMBtu
|
- | - | - | |
03 | 2.2135: Repair and eliminate steam leaks | $17,271 | $3,900 | - | - |
$17,165
-
MMBtu
|
- | - |
$106
-
Tgal
|
|
04 | 2.2124: Install de-aerator in place of condensate tank | $12,910 | $900 | - | - |
$12,910
-
MMBtu
|
- | - | - | |
05 | 2.2414: Use waste heat from hot flue gases to preheat | $3,728 | $42,000 | - | - |
$3,728
-
MMBtu
|
- | - | - | |
06 | 2.7135: Install occupancy sensors | $94 | $713 |
$94
2,421
kWh
|
- | - | - | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $255 | $714 |
$94
2,409
kWh
|
$40
-
kW-mo/yr
|
- | $45 | $76 | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,344 | $13,017 |
$1,514
38,844
kWh
|
$954
-
kW-mo/yr
|
- | $162 | $714 | - | |
TOTAL RECOMMENDED | $105,621 | $163,244 |
$1,702
43,674
kWh
|
$994
-
kW-mo/yr
|
$101,822
-
MMBtu
|
$207 | $790 |
$106
-
Tgal
|
||
TOTAL IMPLEMENTED | $85,290 | $105,900 | - | - |
$85,184
-
MMBtu
|
- | - |
$106
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs