ITAC Assessment: IA0336
ITAC logo
ITAC Assessment: IA0336
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Pork Products
NAICS 112210: Hog and Pig Farming
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $50
M
to 100
M
# of Employees 140
Plant Area 70,000
ft2
Annual Production 750,000
pieces
Production Hrs. Annual 2,860
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $119,153 4,172,000
kWh
Electricity Demand $89,078 9,408
kW-mo/yr
Electricity Fees $16,557 -
Natural Gas $313,075 61,187
MMBtu
LPG $18,745 3,671
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,596 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $53,651

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.1241: Reduce excessive boiler blowdown $3,854 $4,300 - - $3,261
-
MMBtu
$593
02 2.2414: Use waste heat from hot flue gases to preheat $17,930 $20,000 - - $17,930
-
MMBtu
-
03 2.1224: Replace boiler $27,684 $150,000 - - $27,684
-
MMBtu
-
04 2.4133: Use most efficient type of electric motors $199 $80 $102
3,528
kWh
$97
-
kW-mo/yr
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $499 $400 $289
7,235
kWh
$210
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,139 $1,364 $1,312
45,171
kWh
$827
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,346 $1,197 $718
24,764
kWh
$628
-
kW-mo/yr
- -
08 2.7135: Install occupancy sensors $906 $7,407 $906
31,198
kWh
- - -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,039 $7,405 $1,161
40,040
kWh
$878
-
kW-mo/yr
- -
TOTAL RECOMMENDED $56,596 $192,153 $4,488
151,936
kWh
$2,640
-
kW-mo/yr
$48,875
-
MMBtu
$593
TOTAL IMPLEMENTED $53,651 $177,341 $2,421
80,698
kWh
$1,762
-
kW-mo/yr
$48,875
-
MMBtu
$593
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs