| Assessment Year | 2001 |
|---|---|
| Principal Product | Chemicals |
| NAICS |
n/a
|
| SIC | 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified |
| Sales Range | $100 M to 500M |
| # of Employees | 96 |
| Plant Area |
1,817,900
ft2
|
| Annual Production | 1,000,000
ton
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Iowa |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $4,471,975 | 151,877,484 |
kWh
|
$0.029 |
| Natural Gas | $49,351,062 | 12,865,166 |
MMBtu
|
$3.84 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $155,847 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $113,298 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,114 | - |
$1,742
67,788
kWh
|
$1,372
-
kW-mo/yr
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,020 | - |
$3,152
122,640
kWh
|
$1,372
-
kW-mo/yr
|
- | $5,496 | |
| 03 | 2.7135: Install occupancy sensors | $845 | $668 |
$845
32,890
kWh
|
- | - | - | |
| 04 | 2.7135: Install occupancy sensors | $604 | $1,592 |
$604
23,516
kWh
|
- | - | - | |
| 05 | 2.2113: Repair or replace steam traps | $87,600 | $7,916 | - | - |
$87,600
-
MMBtu
|
- | |
| 06 | 2.2135: Repair and eliminate steam leaks | $25,698 | $10,330 | - | - |
$25,698
-
MMBtu
|
- | |
| 07 | 2.1133: Adjust burners for efficient operation | $4,493 | $7,500 | - | - |
$4,493
-
MMBtu
|
- | |
| 08 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $23,473 | $10,000 | - | - |
$23,473
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $155,847 | $38,006 |
$6,343
246,834
kWh
|
$2,744
-
kW-mo/yr
|
$141,264
-
MMBtu
|
$5,496 | ||
| TOTAL IMPLEMENTED | $113,298 | $18,246 | - | - |
$113,298
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs