ITAC Assessment: IA0045
ITAC logo
ITAC Assessment: IA0045
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product aluminum and zinc castings
NAICS
n/a
SIC 3363: Aluminum Die-Castings
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 100,000
ft2
Annual Production 1,890,349
lb
Production Hrs. Annual 6,120
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $150,359 5,890,094
kWh
Natural Gas $143,207 55,136
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,069 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,886

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $15,690 $660 $15,690
279,308
kWh
-
02 2.7241: Install outside air damper / economizer on hvac unit $3,118 $1,188 $3,118
55,393
kWh
-
03 2.7492: Use proper thickness of insulation on building envelope $4,196 $2,893 - $4,196
-
MMBtu
04 2.7111: Reduce illumination to minimum necessary levels $3,763 $714 $3,763
67,116
kWh
-
05 2.7135: Install occupancy sensors $2,302 $1,215 $2,302
41,032
kWh
-
TOTAL RECOMMENDED $29,069 $6,670 $24,873
442,849
kWh
$4,196
-
MMBtu
TOTAL IMPLEMENTED $19,886 $3,553 $15,690
279,308
kWh
$4,196
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs