ITAC Assessment: HO0007
ITAC logo
ITAC Assessment: HO0007
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product MILK AND DAIRY PRODUCTS
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area
n/a
Annual Production 10,500
Tgal
Production Hrs. Annual 3,744
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $375,889 4,275,498
kWh
Natural Gas $7,354 1,176
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,879 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $690 - $895
10,258
kWh
- $(-205.0)
02 2.4133: Use most efficient type of electric motors $694 $1,180 $694
7,913
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $547 $1,489 $547
6,155
kWh
- -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $27,761 - $30,835
350,821
kWh
$(-3,074.0)
-
MMBtu
-
05 2.2511: Insulate bare equipment $187 $256 $187
2,052
kWh
- -
TOTAL RECOMMENDED $29,879 $2,925 $33,158
377,199
kWh
$(-3,074.0)
-
MMBtu
$(-205.0)
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs