ITAC Assessment: GT0934
ITAC logo
ITAC Assessment: GT0934
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Animal Health Vaccines
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $50
M
to 100
M
# of Employees 233
Plant Area 235,000
ft2
Annual Production 38,000,000,000
units
Production Hrs. Annual 3,120
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,168,433 12,201,618
kWh
Natural Gas $215,688 29,228
MMBtu
TOTAL YEARLY COSTS $1,384,121
RECOMMENDED SAVINGS* $357,990 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,870

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2625: Chill water to the highest temperature possible $2,153 $250 $2,153
22,426
kWh
-
02 2.2511: Insulate bare equipment $2,334 $1,238 - $2,334
-
MMBtu
03 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $9,210 $19,899 $9,210
95,932
kWh
-
04 2.5195: Change product design to reduce energy requirements $305,911 $903,775 $305,911
3,186,577
kWh
-
05 2.7492: Use proper thickness of insulation on building envelope $445 $2,770 $445
4,633
kWh
-
06 2.9113: Use solar heat for heat $37,938 $246,597 $37,938
395,164
kWh
-
TOTAL RECOMMENDED $357,990 $1,174,529 $355,656
3,704,732
kWh
$2,334
-
MMBtu
TOTAL IMPLEMENTED $42,870 $250,856 $40,536
422,223
kWh
$2,334
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs