ITAC Assessment: GT0923
ITAC logo
ITAC Assessment: GT0923
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product furniture
NAICS 337121: Upholstered Household Furniture Manufacturing
SIC 2512: Wood Household Furniture, Upholstered
Sales Range $100
M
to 500
M
# of Employees 336
Plant Area 519,048
ft2
Annual Production 240,422
units
Production Hrs. Annual 5,200
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $354,294 3,067,360
kWh
TOTAL YEARLY COSTS $354,294
RECOMMENDED SAVINGS* $122,289 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $24,479 $11,900 $24,479
203,987
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $32,706 $21,021 $32,706
272,549
kWh
03 2.9114: Use solar heat to make electricty $33,904 $274,000 $33,904
293,527
kWh
04 3.5311: Recover and reuse waste material $31,200 $120,000 $31,200
260,000
kWh
TOTAL RECOMMENDED $122,289 $426,921 $122,289
1,030,063
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs