ITAC Assessment: GT0920
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Rubber & Foam Mats
NAICS 314110: Carpet and Rug Mills
SIC 2273: Carpets and Rugs
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 373,000
ft2
Annual Production 55,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $749,260 9,023,000
kWh
Natural Gas $80,022 25,685
MMBtu
TOTAL YEARLY COSTS $829,282
RECOMMENDED SAVINGS* $20,771 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,771

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,551 $629 $8,551
106,886
kWh
-
02 2.2511: Insulate bare equipment $5,826 $1,645 - $5,826
-
MMBtu
03 2.2511: Insulate bare equipment $360 $386 $360
4,494
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,465 $3,500 $2,465
30,815
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,569 $5,081 $3,569
44,613
kWh
-
TOTAL RECOMMENDED $20,771 $11,240 $14,945
186,808
kWh
$5,826
-
MMBtu
TOTAL IMPLEMENTED $20,771 $11,240 $14,945
186,808
kWh
$5,826
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs