Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Ceramic Bricks and Fibers
NAICS 327120: Clay Building Material and Refractories Manufacturing
SIC 3297: Nonclay Refractories
Sales Range $100
M
to 500
M
# of Employees 600
Plant Area 244,000
ft2
Annual Production 112,600,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $4,975,092 84,349,175
kWh
Natural Gas $3,427,832 358,571
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $141,519 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,600

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $21,600 $8,000 $21,600
308,974
kWh
02 2.4239: Eliminate or reduce compressed air usage $77,000 $12,000 $77,000
1,103,760
kWh
03 2.4239: Eliminate or reduce compressed air usage $42,919 $63,600 $42,919
614,882
kWh
TOTAL RECOMMENDED $141,519 $83,600 $141,519
2,027,616
kWh
TOTAL IMPLEMENTED $21,600 $8,000 $21,600
308,974
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs