Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Lubricating Oil
NAICS 324191: Petroleum Lubricating Oil and Grease Manufacturing
SIC 2992: Lubricating Oils and Greases
Sales Range $50
M
to 100
M
# of Employees 30
Plant Area 1,568,160
ft2
Annual Production 26,000
Tgal
Production Hrs. Annual 4,750
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $79,051 1,864,401
kWh
Electricity Demand $44,121 4,963
kW-mo/yr
Electricity Fees $44,506 -
LPG $12,584 506
MMBtu
Fuel Oil #2 $394,968 25,165
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $170,210 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $145,032

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.4314: Use synthetic lubricant $1,678 - $1,203
26,800
kWh
$475
-
kW-mo/yr
- - - -
02 2.1332: Convert combustion equipment to burn natural gas $140,680 $87,010 - - $(-237,991.0)
-
MMBtu
- $378,671
-
MMBtu
-
03 2.1332: Convert combustion equipment to burn natural gas $8,256 $36,000 - - $(-3,674.0)
-
MMBtu
$11,930
-
MMBtu
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,756 $5,548 $1,238
27,582
kWh
$518
-
kW-mo/yr
- - - -
05 2.2135: Repair and eliminate steam leaks $9,422 $1,250 $7,314
162,900
kWh
$2,108
-
kW-mo/yr
- - - -
06 2.8118: Check for accuracy of utility / power meters $1,790 - - - - - - $1,790
07 2.4239: Eliminate or reduce compressed air usage $3,966 $4,500 $1,976
44,000
kWh
$1,990
-
kW-mo/yr
- - - -
08 2.7124: Make a practice of turning off lights when not needed $918 - $647
14,400
kWh
$271
-
kW-mo/yr
- - - -
09 2.8114: Change rate schedules or other changes in utility service $1,744 $5,630 $(-1,373.0)
(-30,576)
kWh
$(-791.0)
-
kW-mo/yr
- - - $3,908
TOTAL RECOMMENDED $170,210 $139,938 $11,005
245,106
kWh
$4,571
-
kW-mo/yr
$(-241,665.0)
-
MMBtu
$11,930
-
MMBtu
$378,671
-
MMBtu
$5,698
TOTAL IMPLEMENTED $145,032 $92,558 $3,088
68,782
kWh
$1,264
-
kW-mo/yr
$(-237,991.0)
-
MMBtu
- $378,671
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Fuel Oil #2 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs