| Assessment Year | 2005 |
|---|---|
| Principal Product | Icing, Glazes, Cakes |
| NAICS | 311999: All Other Miscellaneous Food Manufacturing |
| SIC | 2099: Food Preparations, Not Elsewhere Classified |
| Sales Range | $100 M to 500M |
| # of Employees | 200 |
| Plant Area |
200,000
ft2
|
| Annual Production | 250,000,000
lb
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $737,238 | 9,229,778 |
kWh
|
$0.080 |
| Natural Gas | $348,870 | 42,907 |
MMBtu
|
$8.13 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $227,999 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $56,553 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4312: Improve lubrication practices | $3,405 | - |
$3,405
81,463
kWh
|
- | - | - | |
| 02 | 2.2414: Use waste heat from hot flue gases to preheat | $28,824 | $20,700 | - | - |
$28,824
-
MMBtu
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,607 | $6,694 |
$1,389
40,392
kWh
|
$1,218
-
kW-mo/yr
|
- | - | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $14,135 | $3,000 |
$14,135
338,149
kWh
|
- | - | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,312 | $750 |
$8,312
198,863
kWh
|
- | - | - | |
| 06 | 2.2531: Re-size charging openings or add movable cover or door | $1,877 | $1,300 |
$1,877
44,900
kWh
|
- | - | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,119 | $5,334 |
$6,119
146,390
kWh
|
- | - | - | |
| 08 | 2.2628: Utilize a less expensive cooling method | $162,720 | $25,000 |
$20,220
483,725
kWh
|
- | - | $142,500 | |
| TOTAL RECOMMENDED | $227,999 | $62,778 |
$55,457
1,333,882
kWh
|
$1,218
-
kW-mo/yr
|
$28,824
-
MMBtu
|
$142,500 | ||
| TOTAL IMPLEMENTED | $56,553 | $25,750 |
$27,729
663,375
kWh
|
- |
$28,824
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs