ITAC Assessment: GT0771
ITAC logo
ITAC Assessment: GT0771
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product AUTO PISTONS
NAICS 336310: Motor Vehicle Gasoline Engine and Engine Parts Manufacturing
SIC 3592: Carburetors, Pistons, Piston Rings, and Valves
Sales Range $10
M
to 50
M
# of Employees 252
Plant Area 105,000
ft2
Annual Production 7,500,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $759,889 23,678,400
kWh
Electricity Demand $246,989 42,871
kW-mo/yr
Natural Gas $113,555 13,500
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $126,987 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $37,310

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.8112: Combine utility meters $3,600 - - - $3,600
02 2.2691: Shut off cooling if cold outside air will cool process $17,568 $23,870 $11,881
352,516
kWh
$5,687
-
kW-mo/yr
-
03 2.2691: Shut off cooling if cold outside air will cool process $882 $650 $189
5,987
kWh
$693
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $15,260 $1,050 $12,325
365,671
kWh
$2,935
-
kW-mo/yr
-
05 2.4322: Use or replace with energy efficient substitutes $28,826 $1,248 $23,284
739,200
kWh
$5,542
-
kW-mo/yr
-
06 2.2514: Cover open tanks $3,255 $3,703 $2,628
77,960
kWh
$627
-
kW-mo/yr
-
07 2.2514: Cover open tanks $2,447 $3,500 $1,975
58,617
kWh
$472
-
kW-mo/yr
-
08 2.2514: Cover open tanks $23,765 $700 $19,184
569,168
kWh
$4,581
-
kW-mo/yr
-
09 2.2511: Insulate bare equipment $29,561 $12,093 $23,880
708,495
kWh
$5,681
-
kW-mo/yr
-
10 2.6218: Turn off equipment when not in use $1,823 - $1,823
54,078
kWh
- -
TOTAL RECOMMENDED $126,987 $46,814 $97,169
2,931,692
kWh
$26,218
-
kW-mo/yr
$3,600
TOTAL IMPLEMENTED $37,310 $25,570 $24,395
724,174
kWh
$9,315
-
kW-mo/yr
$3,600
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs