Assessment Year | 2000 |
---|---|
Principal Product | Light Truck Transmissions |
NAICS |
n/a
|
SIC | 3568: Mechanical Power Transmission Equipment, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 300 |
Plant Area |
171,000
ft2
|
Annual Production | 80,000
pieces
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $219,403 | 8,601,407 |
kWh
|
$0.026 |
Electricity Demand | $176,130 | 14,658 |
kW-mo/yr
|
$12.02 |
Electricity Fees | $81,013 | - |
|
- |
Natural Gas | $42,175 | 7,909 |
MMBtu
|
$5.33 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $162,143 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,601 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,305 | $250 |
$2,174
57,151
kWh
|
$131 | - | - | - | - | |
02 | 2.6218: Turn off equipment when not in use | $45,153 | $5,000 |
$716
5,569
kWh
|
- |
$41,270
-
MMBtu
|
- | - | $3,167 | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,306 | $8,892 |
$3,306
82,063
kWh
|
- | - | - | - | - | |
04 | 2.7135: Install occupancy sensors | $1,317 | $1,375 |
$1,242
32,532
kWh
|
$75 | - | - | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,419 | $8,778 |
$2,284
59,203
kWh
|
$135 | - | - | - | - | |
06 | 2.7232: Replace existing hvac unit with high efficiency model | $100,083 | $160,000 |
$100,083
2,227,433
kWh
|
- | - | - | - | - | |
07 | 3.5316: Contract a wood pallet recycling company | $7,200 | - | - | - | - | - | $7,200 | - | |
08 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $360 | - | - | - | - |
$360
-
lb
|
- | - | |
TOTAL RECOMMENDED | $162,143 | $184,295 |
$109,805
2,463,951
kWh
|
$341 |
$41,270
-
MMBtu
|
$360
-
lb
|
$7,200 | $3,167 | ||
TOTAL IMPLEMENTED | $13,601 | $10,403 |
$5,700
148,886
kWh
|
$341 | - |
$360
-
lb
|
$7,200 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs