ITAC Assessment: GT0696
ITAC logo
ITAC Assessment: GT0696
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Light Truck Transmissions
NAICS
n/a
SIC 3568: Mechanical Power Transmission Equipment, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area 171,000
ft2
Annual Production 80,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $219,403 8,601,407
kWh
Electricity Demand $176,130 14,658
kW-mo/yr
Electricity Fees $81,013 -
Natural Gas $42,175 7,909
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $162,143 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,601

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,305 $250 $2,174
57,151
kWh
$131 - - - -
02 2.6218: Turn off equipment when not in use $45,153 $5,000 $716
5,569
kWh
- $41,270
-
MMBtu
- - $3,167
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,306 $8,892 $3,306
82,063
kWh
- - - - -
04 2.7135: Install occupancy sensors $1,317 $1,375 $1,242
32,532
kWh
$75 - - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,419 $8,778 $2,284
59,203
kWh
$135 - - - -
06 2.7232: Replace existing hvac unit with high efficiency model $100,083 $160,000 $100,083
2,227,433
kWh
- - - - -
07 3.5316: Contract a wood pallet recycling company $7,200 - - - - - $7,200 -
08 3.5212: Regrind, reuse, or sell scrap plastic parts $360 - - - - $360
-
lb
- -
TOTAL RECOMMENDED $162,143 $184,295 $109,805
2,463,951
kWh
$341 $41,270
-
MMBtu
$360
-
lb
$7,200 $3,167
TOTAL IMPLEMENTED $13,601 $10,403 $5,700
148,886
kWh
$341 - $360
-
lb
$7,200 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs