ITAC Assessment: GT0659
ITAC logo
ITAC Assessment: GT0659
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Cargo Plane Parts
NAICS
n/a
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 101,075
ft2
Annual Production 12
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $83,715 2,981,829
kWh
Electricity Demand $103,300 6,508
kW-mo/yr
Electricity Fees $12,000 -
Natural Gas $19,492 2,524
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $186,546 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.3192: Use fossil fuel powered generator during peak demand periods $88,180 $220,000 n/a $12,979
370,750
kWh
$97,060
-
kW-mo/yr
- - $(-16,296.0)
-
MMBtu
- $(-5,563.0) -
02 2.8113: Purchase gas directly from a contract gas supplier $3,484 - n/a - - - - - - - $3,484
03 3.5315: Lease / purchase baler; sell cardboard to recycler $37,040 $10,000 n/a - - - - - $13,335
-
lb
- $23,705
04 2.7132: Install timers on light switches in little used areas $3,123 $400 n/a $1,692
52,755
kWh
$1,254
-
kW-mo/yr
$177 - - - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $9,706 $22,711 n/a $4,314
134,818
kWh
$4,726
-
kW-mo/yr
$666 - - - - -
06 2.7226: Use computer programs to optimize hvac performance $45,013 $120,000 n/a $39,965
1,253,810
kWh
- $2,650 $2,398
-
MMBtu
- - - -
TOTAL RECOMMENDED $186,546 $373,111 $58,950
1,812,133
kWh
$103,040
-
kW-mo/yr
$3,493 $2,398
-
MMBtu
$(-16,296.0)
-
MMBtu
$13,335
-
lb
$(-5,563.0) $27,189
TOTAL IMPLEMENTED - - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs